Oct 14 2010: The atlas and cage have been installed. The cage is a big step since the frame will be tied into it. It was impeding my current goal of just getting rolling. I was hoping to make it down for a week but it seems the starter went out on my mustang. The only thing I have left to purchase would be the PSC pump which will crappy because my Stroker has a 99 intake and the Current engine is a Renix. Two different mounting setups :/
Aug 29th 2010: Continuously getting fucked hopefully this doesn't become a log of my inevitable failure. Right now I'm working on cleaning another jeep project out of my garage and getting my Mustang back on its feet. On the bright side it made the trip from California
Feb 7th 2010: I contacted my brother inlaw. Matt and he agreed to work on the jeep on fridays. Matt's a skilled welder so it should be good for the build. Atleast better then the crawling pace it's currently moving at.
Jan 2010: I contacted MP's custom rides who said they've "mocked" things up to be welded.
Dec 6th 2009: I went down to California to check up on her and she's basically in the same state. The fenders have been trimmed. After my visit my dad stopped by and installed the Atlas.
April 2009: I received an Update of the status which is almost the same as I left it aside from the axles being rolled under it and Lines where they're going to cut. My goal is to have as much cut as possible and stay low to the ground.
Sept 2008: Project K.I.A was dropped off at MP's Custom Rides. I stripped the Interior and Axles.